Skip to main content
Level 3
December 7, 2019
Solved

#8829, simplified won't carryover total sq ' to schedule C, so can't file, or even override and file- how to fix?

  • December 7, 2019
  • 1 reply
  • 24 views
No text available
This topic has been closed for replies.
Best answer by rbynaker

You have to fill out the Simple Method Smart Worksheet and then scroll down and enter the square footage on lines 1 and 2.  You also need a date in Part II, Line 8 Worksheet, Box A.

They really should streamline this for simplified method folks.  One box at the top where you enter everything.  Then all the extra stuff at the bottom if you're doing a full 8829.  But they don't let me write the software.

1 reply

rbynaker
rbynakerAnswer
Level 13
December 7, 2019

You have to fill out the Simple Method Smart Worksheet and then scroll down and enter the square footage on lines 1 and 2.  You also need a date in Part II, Line 8 Worksheet, Box A.

They really should streamline this for simplified method folks.  One box at the top where you enter everything.  Then all the extra stuff at the bottom if you're doing a full 8829.  But they don't let me write the software.

joanvAuthor
Level 3
December 7, 2019
no, all was there, doesn't carryover to C